Your customer opens the box and the bracket isn’t there. Or the cable. Or the manual. They don’t blame whoever made the bracket. They blame you.
Or the kits do go out right, but only because your production team drops everything on a Friday afternoon to build them on a spare bench.
Either way, kitting has become a job you never meant to run. Here is what it is, how it should work, and how to take it off your plate.
Kitting is the process of bringing separate components together into one ready-to-ship unit, a kit, with its own product code. Assembly goes a step further and puts those components together into a finished or part-finished product. Done in a warehouse, both mean your customer receives one complete, checked item instead of several parts that have to be matched up at their end.
This guide covers how kitting actually works on a warehouse floor, the difference between kitting, assembly and pick and pack, when it makes sense to outsource it, how it is priced, and how to make sure every kit comes out right. It is written by the team that runs kitting and assembly for premium manufacturers at our Trafford Park warehouse.
In this guide
- Kitting, assembly and pick and pack: the difference
- Common types of kitting
- How a kitting operation works
- Build to stock or build to order?
- Getting every kit right
- How kitting is priced
- In-house or outsourced kitting?
- Signs kitting would help your business
- Questions to ask a kitting partner
- Frequently asked questions
Kitting, assembly and pick and pack: the difference
The three get used interchangeably. They are not the same job, and they are not priced the same way.
| What happens | What leaves the warehouse | Example | |
|---|---|---|---|
| Pick and pack | Items from an order are picked from stock and packed together. | Several separate products in one shipment. Each keeps its own product code. | A trade customer orders 20 units of one product and 5 of another. |
| Kitting | Set components are brought together into one unit with its own product code, often in its own box. | One kit, sold and tracked as one item. | A product shipped with its cables, mounting hardware and manual as a single boxed unit. |
| Assembly | Components are physically fitted together. | A finished or part-finished product. | Fitting stands, brackets or accessories to a product before it ships. |
The key difference is the product code. Pick and pack ships the products you ordered. Kitting creates a new product out of several others. That matters for your stock records, because every kit built uses up components, and every component shortage stops kits being built.
Common types of kitting
- Product kits. A main product plus everything that goes with it: fixings, cables, accessories, documentation. The customer opens one box and has everything.
- Installation and service kits. Parts that an engineer or installer needs for one job, packed together so nothing is missing when they arrive on site.
- Spare parts kits. Common replacement parts grouped by model or service interval.
- Production or line-side kits. Components grouped for a manufacturing line, so the line is fed with exactly what each build needs instead of operators hunting through bulk stock.
- Light assembly. Fitting parts together, configuring a product or adding accessories before despatch.
How a kitting operation works

Use this infographic on your site: copy the code below. Please keep the credit link.
<a href="https://solarislogistics.co.uk/what-is-kitting/"><img src="https://solarislogistics.co.uk/wp-content/uploads/2026/10/infographic-how-kitting-works.png" alt="How kitting works: from separate components to one finished, checked kit" width="1200" /></a>
<p>Infographic by <a href="https://solarislogistics.co.uk/what-is-kitting/">Solaris Logistics</a></p>
- Components arrive and are stored. Each component is booked in and stored under its own code. Kitting starts with good stock control, because a kit can only be built if every component is there.
- A kit is set up against a bill of materials. The bill of materials (BOM) lists every component and quantity in one kit. It is loaded into the warehouse system so the kit has its own code.
- A kit order comes in. Either a works order to build a batch for stock, or a customer order that triggers a build.
- Parts are pulled against the BOM. The system tells the team exactly which components, how many and from where.
- The kit is built. Components are assembled or packed to your build instructions, at a bench set up for the job.
- Every kit is checked before it is sealed. Against the parts list, and where it helps, by weight or photo against a signed-off sample.
- Stock updates. Components come out of stock and the finished kit goes in, or goes straight out on a delivery.
- Despatch. The kit ships to your customer, your retailer’s DC or your own production line.
The step that causes the most trouble is the first one. Kits fail because of component stock, not because of the build. One missing washer stops a hundred kits. A good kitting partner watches component levels against your forecast and tells you about a shortage before it stops the line, not after.
Build to stock or build to order?
There are two ways to run kitting, and most operations end up using both.
| Build to stock (pre-kitting) | Build to order (kit on demand) | |
|---|---|---|
| How it works | Kits are built in batches ahead of demand and stored ready to ship. | Kits are built when an order arrives. |
| Best for | Steady, predictable demand. Kits that take a while to build. | Variable demand, many kit variations, kits that change often. |
| Speed to ship | Fastest. The kit is already on the shelf. | Slower. Build time is added to every order. |
| Risk | Finished kits sitting in stock. If the BOM changes, built kits may need reworking. | Less built stock to manage, but you need component stock and labour on hand for every order. |
| Cost | Batch building is more efficient per kit. | Each build is a smaller job, so the per-kit cost is usually higher. |
A sensible approach for most manufacturers: build your top sellers to stock, build the long tail to order, and review the split every quarter.
Getting every kit right
A picking error sends the wrong product. A kitting error sends a product that looks right and fails at your customer’s end. That is why the checks matter more than the speed.
- A signed-off sample kit. Before the first build, a “golden sample” is built, photographed and signed off by you. Every kit after that is built to match it.
- Clear build instructions. Photos at each stage beat written instructions. They are what a new team member works from on a busy day.
- A check before sealing. Every kit is checked against its parts list before the box is closed. Weight checks catch a missing component that a visual check can miss.
- Version control. When you change a component or a supplier, the BOM gets a new revision with a start date, so nobody builds the old version from habit.
- Component quality at goods in. A faulty batch of components makes a faulty batch of kits. Checking at goods in is cheaper than reworking finished kits.
- Traceability. Where it matters, recording batch or serial numbers against each kit, so a supplier issue can be traced to the exact kits affected.
Kitting is fiddly, and it is where cheap operators cut corners. A kitting mistake does not cost you a return. It costs you a customer.
How kitting is priced
Kitting is usually priced per kit, built up from the time and materials it takes. Expect a quote to include:
| Charge | What it covers | Usually charged |
|---|---|---|
| Set-up | Loading the BOM, writing up build instructions, building and signing off the sample, setting up the bench. | One-off per kit type, or included. |
| Component goods in and storage | Receiving and storing the parts. | As for any 3PL storage: per pallet per week, and per pallet or carton in. |
| Kit build | Pulling components, building, checking and sealing each kit. | Per kit, based on build time. Larger or one-off jobs may be quoted per hour. |
| Packaging | Kit boxes, inserts, labels. | Per kit, or you supply your own. |
| Despatch and delivery | Picking finished kits and delivering them. | Per order, pallet or vehicle. |
What drives the per-kit cost:
- Number of components. Every extra component is another pick and another thing to check.
- How components arrive. Parts that come individually bagged or boxed have to be unpacked before they go into the kit. That unpacking time is often bigger than the build itself, and it is worth talking to your suppliers about.
- Complexity of the build. Fitting, configuring or testing takes longer than packing loose parts in a box.
- Batch size and consistency. A steady flow of kits lets the team build a rhythm. Short, unpredictable runs cost more per kit.
- Quality of the instructions and sample. Clear instructions mean fewer questions, fewer mistakes and a faster build.
In-house or outsourced kitting?
| In-house | Outsourced to a 3PL | |
|---|---|---|
| Space | Uses your production or warehouse space. | Uses the 3PL’s space, alongside your stock. |
| Labour | Your people, often pulled off higher-value work at busy times. | A trained team that scales with your volumes. |
| Stock handling | Components move from your warehouse to the kitting area and back. | Components, kits and despatch are all in one place, with no extra transport. |
| Control | Total. Easy to change things on the day. | Shared. Works best with a partner who gives you direct access and adapts to your process. |
| Cost | Fixed costs whether kits are being built or not. | Mostly paid per kit. |
Outsourcing kitting makes most sense when your stock is already with a 3PL, or should be. Building kits in the same building that stores the components and ships the finished kits removes a whole round trip from the process.
Signs kitting would help your business
- Your customers receive several boxes for one product, or call to ask where the missing part is.
- Your own team builds kits on the warehouse floor or a spare bench whenever there is a big order.
- Your production line is stopped by missing parts that are in stock somewhere.
- Your retailers ask for products combined or labelled in a way your current operation struggles to do.
- Kit errors are reaching customers and costing you returns and goodwill.
- You have launched a new product that combines items you already sell.
Questions to ask a kitting partner
- Do you run kitting now, for whom (by sector) and at what volume?
- How will you load my bill of materials, and how are BOM changes controlled?
- What checks happen on every kit before it is sealed?
- How will you warn me about component shortages before they stop builds?
- Can you build to stock and to order, and help me decide which kits suit which?
- Who signs off the sample kit, and what happens if a kit does not match it?
- Can you store my components, build the kits and deliver them, all under one account?
- Can I visit and see a kitting job being run?
Frequently asked questions
What is kitting in a warehouse?
Kitting in a warehouse is bringing several separate components together into one unit, with its own product code, ready to ship. It is usually done by the warehouse that already stores the components.
What is the difference between kitting and assembly?
Kitting groups components into one unit, usually packed together in one box. Assembly physically fits components together into a finished or part-finished product. Many kitting jobs include some assembly.
What is the difference between kitting and pick and pack?
Pick and pack ships the separate products a customer ordered, each with its own product code. Kitting builds a new product, with its own code, from several components.
What is a bill of materials in kitting?
The bill of materials (BOM) is the list of every component and quantity that goes into one kit. The warehouse uses it to pull the right parts and to update stock when a kit is built.
What do I need to start outsourcing kitting?
Your bill of materials, your build instructions (photos help) and a sample finished kit. Your partner then sets up the process, builds a sample for you to sign off and runs a trial batch before full production.
Can kitting be done alongside storage and delivery?
Yes. It works best that way, because components, finished kits and despatch stay in one building with one team.
Kitting and assembly from Trafford Park
Solaris runs kitting and assembly for premium manufacturers from our warehouse in Trafford Park, Manchester, alongside 3PL warehousing, pallet storage and our own transport fleet. Components come in, kits are built and checked against your bill of materials, and finished kits go out on our own vehicles across the North West, Yorkshire, the Midlands and nationwide.
New to outsourcing your warehouse? Start with our guide: What is 3PL?
If you have a kitting job in mind, send us an enquiry with what goes into a kit and roughly how many a month, or call 0330 133 4650.